| No. | Project Description | Client | Contract Date |
|---|---|---|---|
| 1 | Equipment supply, cabling, and lighting for workshop site civil works | Foreign Company | — |
| 2 | Installation of workshop site equipment in 2022, valued at over €2.6 million | Iranian Organization | 2022 |
| 3 | Design and construction of power supply lines to buildings under construction and contracted investors in 2021, valued at over IRR 430 billion | Iranian Mines & Mining Industries Development and Renovation Organization (IMIDRO) | 2022-03-08 |
| 4 | Infrastructure works and supply & installation of prefabricated concrete walls around the 18,000-ton LPG facilities in Rey (2020), valued at over IRR 120 billion | National Iranian Oil Products Distribution Company (NIOPDC) | 2021-02-28 |
| 5 | Design, engineering, and construction of a new 2D electrical substation, including supply and installation of switchgears and cables (EPC) in 2016, valued at IRR 76 billion and €600,000 | Tehran Oil Refining Company (Shahid Tondguyan) | 2016-09-13 |
| 6 | Design, engineering, and construction of a new 2B electrical substation, including supply and installation of switchgears and cables (EPC) in 2013, valued at IRR 80 billion | Tehran Oil Refining Company (Shahid Tondguyan) | 2014-02-22 |
| No. | Project Description | Client | Contract Date |
|---|---|---|---|
| 1 | Installation of workshop area equipment in 2022, over €2.6 million | Iran Organization | 2022 |
| 2 | Revamping of 230 & 63 kV substations at Rey Power Plant as EPC | Tehran Oil Refinery (Shahid Tondgouyan) | 2022/07/11 |
| 3 | Electrical operations of the Light Naphtha Unit at Shiraz Oil Refinery as EPC | Shiraz Oil Refinery Company | 2019/11/12 |
| 4 | Design, supply, and construction of new 2D auxiliary power center including design, supply, and installation of switchgears and cables as EPC in 2016, over 76 billion IRR and €600k | Tehran Oil Refinery (Shahid Tondgouyan) | 2016/09/14 |
| 5 | Development of 230/63 kV Rey Gas Substation and 20/63 kV Rey Gas Substation in 2015, over 300 billion IRR and €250k | Tehran Oil Refinery (Shahid Tondgouyan) | 2015/11/10 |
| 6 | Civil works, installation, and commissioning of 33/230 kV Saran Dogonbadan Substation | Khuzestan Regional Electricity Company | 2014/04/15 |
| 7 | Design, supply, and construction of new 2B auxiliary power center including design, supply, and installation of switchgears and cables as EPC in 2013, over 80 billion IRR | Tehran Oil Refinery (Shahid Tondgouyan) | 2013/02/22 |
| 8 | Civil works, installation, and commissioning of 33/132 kV Shoosh 2 Substation | Khuzestan Regional Electricity Company | 2012/02/05 |
| 9 | Installation and commissioning of 33/132 kV Yasuj 2 Substation | Khuzestan Regional Electricity Company | 2010/11/09 |
| 10 | Installation and commissioning of temporary substation at Fajr Petrochemical, Mahshahr | Khuzestan Regional Electricity Company | 2009/05/19 |
| No. | Project Description | Client | Contract Date |
|---|---|---|---|
| 1 | Supply of equipment, cabling, and lighting works related to civil works of the workshop site | Foreign Company | — |
| 2 | Installation of workshop site equipment in 2022, valued at over €2.6 million | Iranian Organization | 2022 |
| 3 | Design and construction of power supply lines for buildings under construction and contracted investors in 2021, valued at over IRR 430 billion | Iranian Mines and Mining Industries Development and Renovation Organization (IMIDRO) | 2022-03-08 |
| 4 | Infrastructure works and supply and installation of prefabricated concrete walls surrounding the 18,000-ton LPG facilities in Rey in 2020, valued at over IRR 120 billion | National Iranian Oil Products Distribution Company | 2021-02-28 |
| 5 | Design, engineering, and construction of a new 2D electrical substation, including design, supply, and installation of switchgears and cables on an EPC basis in 2016, valued at IRR 76 billion and €600,000 | Tehran Oil Refining Company (Shahid Tondguyan) | 2016-09-13 |
| 6 | Design, engineering, and construction of a new 2B electrical substation, including design, supply, and installation of switchgears and cables on an EPC basis in 2013, valued at IRR 80 billion | Tehran Oil Refining Company (Shahid Tondguyan) | 2014-02-22 |
| No. | Project Description | Client | Contract Date |
|---|---|---|---|
| 1 | Upgrading of photovoltaic systems | Chaharmahal and Bakhtiari Provincial Power Distribution Company | 2022-07-11 |
| 2 | Supply of 51 battery bank units for a solar power plant | Chaharmahal and Bakhtiari Provincial Power Distribution Company | 2019-11-12 |
| 3 | Supply of a 300-W portable photovoltaic system | Chaharmahal and Bakhtiari Provincial Power Distribution Company | 2016-09-13 |
| 4 | Solar energy training and educational assistance system | Technical and Vocational Organization of Chaharmahal and Bakhtiari Province | 2015-11-10 |
| 5 | Solar energy training and educational assistance system | Technical and Vocational Organization of Chaharmahal and Bakhtiari Province | 2014-04-15 |
| 6 | Rural electrification using photovoltaic systems | South Kerman Provincial Power Distribution Company | 2014-02-22 |
| 7 | Supply and installation of solar water heaters in villages of Fars Province | Fars Province Natural Resources and Watershed Management Organization | 2012-02-05 |
| 8 | Solar energy training and educational assistance system | Technical and Vocational Organization of Ilam Province | 2010-11-09 |
| 9 | Electrification of residential houses in 14 villages of Kuhrang County on an EPC basis, valued at approximately USD 1 million | Chaharmahal and Bakhtiari Provincial Power Distribution Company | 2009-05-19 |
| 10 | Construction and commissioning of a solar power plant at Gahar Lake | Lorestan Provincial Cultural Heritage, Handicrafts and Tourism Organization | 2010-11-15 |
| No. | Project Description | Client | Contract Date |
| 1 | Equipment supply, cabling, lighting, and civil works for workshop area | Foreign Company | |
| 2 | Installation of workshop area equipment in 2022 worth 2.6 million euros | Iranian Organization | 2022 |
| 3 | Reconstruction of electrical systems of quality control building and security unit of Rey Oil Depot | National Iranian Oil Products Distribution Company – Tehran | 2021/11/22 |
| 4 | Removal of defective high-consumption lighting fixtures and supply & installation of low-consumption LED lights at Rey Oil Depot | National Iranian Oil Products Distribution Company – Tehran | 2020/10/22 |
| 5 | Electrical operations of Light Naphtha Unit of Shiraz Oil Refinery (EPC) | Shiraz Oil Refinery Company | 2019/11/12 |
| 6 | Installation, testing, and commissioning of lighting improvement for Ajip shed, machining workshop, and forklift room of Tehran Lubricant Refinery | Iranol Oil Company | 2019/09/02 |
| 7 | Cable supply, cable laying, and trenching works for aerial fan motors | Tehran Oil Refinery Company | 2019/11/06 |
| 8 | Installation of agricultural smart meters (FAHAM) on poles near transformers | Shiraz Power Distribution Company | 2019/03/08 |
| 9 | Testing and calibration of smart water and electricity meters and adjustment of digital meters in Shiraz power distribution area | Shiraz Power Distribution Company | 2019/03/06 |
| 10 | Lighting system of Gachsaran–Behbahan highway | Road Maintenance & Transportation Organization of Kohgiluyeh and Boyer-Ahmad Province | 2018/12/10 |
| 11 | Calibration of more than 1,000 water and electricity panels | Fars Regional Water Authority | 2013/07/31 |
| 12 | Maintenance of overhead and underground power distribution networks for Kaki and Deh-Kohneh pumping stations | Fars Regional Water Authority | 2011/12/06 |
| 13 | Supply and installation of 239 smart water and electricity panels | Fars Regional Water Authority | 2010/07/11 |
| 14 | Design and implementation of grounding and lightning protection system for ZT5.1 building and surrounding area | Iranian Organization | 2009/10/07 |
| 15 | Supply and installation of 750 smart water and electricity panels | Fars Regional Water Authority | 2009/07/08 |
| 16 | Installation of CCTV cameras and lighting system in Bushehr | Iranian Organization | 2009/02/07 |
| 17 | Paging system for a pasteurized milk factory | Electronic Research Company | 2001/03/11 |
| No. | Project Description | Client | Contract Date |
| 1 | Supply of equipment, cabling, lighting, and civil works for workshop area | Foreign Company | |
| 2 | Installation of workshop area equipment in 2022 valued at 2.6 million euros | Iranian Organization | 2022 |
| 3 | Construction of power supply lines for buildings under construction and contracted investors in 2021, valued at 430 billion IRR | Iranian Mines & Mining Industries Development Organization (IMIDRO) | 2022/03/08 |
| 4 | Construction of a 60 km dedicated 20 kV overhead power line for Tehran Oil Pipeline Lines 1 and 3 | National Iranian Gas Transmission Company – Region 3 | 2021/05/12 |
| 5 | Removal of defective high-consumption lighting and supply & installation of low-consumption LED lights at Rey Oil Depot | National Iranian Oil Products Distribution Company | 2020 |
| 6 | Electrical EPC operations for the Light Naphtha Unit | Shiraz Oil Refinery Company | 2019/11/12 |
| 7 | Installation, testing, and commissioning of lighting improvement for Ajip shed, machining workshop, and forklift room | Iranol Oil Company | 2019/09/02 |
| 8 | Supply of cables and execution of cable laying and trenching works for aerial fan motors | Tehran Oil Refinery Company | 2019/08/06 |
| 9 | Relocation and installation of FAHAM smart meters in Beyza area | Shiraz Power Distribution Company | 2019/06/17 |
| 10 | Procurement and full execution of the 66 kV Mahdieh–Amir Kabir transmission line | Shiraz Municipality | 2019/03/09 |
| 11 | Installation of agricultural FAHAM smart meters on poles near transformers | Shiraz Power Distribution Company | 2019/03/08 |
| 12 | Testing and correction of smart water and electricity meters and adjustment of digital meters | Shiraz Power Distribution Company | 2019/03/06 |
| 13 | Lighting system of Gachsaran–Behbahan highway (5 km) – EPC | Kohgiluyeh & Boyer-Ahmad Road Maintenance Organization | 2018/12/10 |
| 14 | Installation, testing, and commissioning of 20/66 kV Shodeh 2 Substation | Fars Regional Electricity Company | 2017/12/23 |
| 15 | Construction of temporary 20/66 kV Tang-e-Aram Substation | Fars Regional Electricity Company | 2018/01/09 |
| 16 | Construction of new 2D power center including MV & LV cabling (EPC), valued at 76 billion IRR and 600,000 EUR | Tehran Oil Refinery Company | 2016/09/13 |
| 17 | Construction of power transmission line connecting gas power plant to Tehran Refinery substation (EPC) | Tehran Oil Refinery Company | 2015/11/10 |
| 18 | Maintenance of photovoltaic systems | Chaharmahal & Bakhtiari Power Distribution Company | 2015/06/21 |
| 19 | Supply of 51 battery banks for solar power plants | Chaharmahal & Bakhtiari Power Distribution Company | 2015/01/22 |
| 20 | Supply of 300-watt portable photovoltaic systems | Chaharmahal & Bakhtiari Power Distribution Company | 2014/12/31 |
| 21 | Construction of dual-circuit 66 kV cable duct and cable laying – Bushehr 1 Gulf | Fars Regional Electricity Company | 2014/11/09 |
| 22 | Construction of new Power Center B including MV & LV cabling (EPC) | Tehran Oil Refinery Company | 2014/04/15 |
| 23 | Civil works and installation of 230/33 kV Saran II Substation – Gachsaran | Khuzestan Regional Electricity Company | 2011/04/15 |
| 24 | Street lighting project of Kurdistan Province (over 11,000 luminaires) – EPC | Iran Energy Efficiency Organization (SABA) | 2012/02/29 |
| 25 | Street lighting project of Khorasan Province (over 12,000 luminaires) – EPC | Iran Energy Efficiency Organization (SABA) | 2012/02/29 |
| 26 | Street lighting project of Hormozgan Province (over 5,000 luminaires) – EPC | Iran Energy Efficiency Organization (SABA) | 2012/02/29 |
| 27 | Lighting of Abgineh axis and construction of 38 km MV overhead and underground network – EPC | Fars Road & Transportation Organization | 2012/03/09 |
| 28 | Civil works and installation of 132/33 kV Shoosh II Substation | Khuzestan Regional Electricity Company | 2012/02/05 |
| 29 | Power supply for Furnace No.4 via underground cabling | Khuzestan Steel Company | 2011/09/27 |
| 30 | 63 kV cable connection project from 63 kV substation to 230 kV Rudan substation | Hormozgan Regional Electricity Company | 2012/03/10 |
| 31 | Design and execution of grounding and lightning protection system for power plant building | Iranian Organization | 2010/02/28 |
| No. | Project Description | Vessel/Equipment | Client | Contract Date |
|---|---|---|---|---|
| 1 | Repair of Diesel Engine 3 | Vessel QUEEN | Atlas Kian Qeshm Shipping | 2017/10/29 |
| 2 | Boiler Repair | Vessel SPICA | Atlas Kian Qeshm Shipping | 2018/02/14 |
| 3 | Boiler Repair | Vessel NELMA | Atlas Kian Qeshm Shipping | 2018/02/17 |
| 4 | Repair of Diesel Engine 3 | Vessel NAIRIS | Atlas Kian Qeshm Shipping | 2016/09/27 |
| 5 | Digital Gyro Repair | Vessel TESALINA | Atlas Kian Qeshm Shipping | 2016/12/08 |
| 6 | Service Air Compressor Repair | Vessel TESALINA | Atlas Kian Qeshm Shipping | 2016/12/08 |
| 7 | Repair of Diesel Engines 2 & 3 | Vessel NAIRIS | Atlas Kian Qeshm Shipping | 2016/03/08 |
| 8 | Design, supply, and commissioning of Low Insulation System | Vessel NAIRIS | Atlas Kian Qeshm Shipping | 2016/03/08 |
| 9 | Software services on systems | Vessel TOPAZIS | Atlas Kian Qeshm Shipping | 2016/03/08 |
| 10 | Electrical Repairs | Vessel NAIRIS | Atlas Kian Qeshm Shipping | 2014/09/27 |